Construction Cost Of 10 Marla House In Lahore

In Pakistan, mainly, people don’t like to buy a house. They prefer to buy a plot first and later build a home the way they like. So, if you already have land and are planning to build a house of your dreams, then this blog will surely help you in a lot of aspects.
While building a home, everyone focuses on multiple factors, as they want the house to be comfortable and lavish. Also, people usually have an idea that it might be the first and last time they are building a house of their own, so they don’t even hesitate to spend.
However, before constructing an A+ category house, an individual should be aware that there are a few procedures that must be taken in order to get an exceptional outcome. Construction Cost refers to and comprises the whole cost of the Project’s construction, including all supervision, materials, supplies, labor, tools, equipment, transportation, and/or other facilities given, utilized, or consumed.
Today, you will discover everything there is to know about 10 Marla homes. So, without any more delay, let’s get straight to work.

10 Marla House Construction Cost for Grey Structure
Before delving into the specifics of the 10 Marla house gray structure cost, it is important to understand the home’s specs.
Covered Area Of 10 Marla House
A 10-marla home typically has a covered space of 2,250 to 3,000 square feet. The covered space of your single-story home will be around 2,250 to 2,500 square feet. There is plenty of storage space, a pleasant living room, a practical dining area, a functional kitchen, comfy bedrooms and a bathroom in this covered area.
A two-story house’s covered space can range between 2,500 and 3,000 square feet. The bottom level has around 1,500 to 1,750 square feet of covered space, which includes a living room, dining area, kitchen, and one or two bedrooms with associated bathrooms. On the first level, which can have a covered space of 750 to 1,250 square feet, a family lounge and additional bedrooms may be installed.

10 Marla House Grey Structure Cost
Constructing a 10-marla gray building may be a fun task, but it can also be difficult, particularly when it comes to estimating its cost. As of 2023, the expected cost of constructing a 10-marla gray construction in Pakistan is PKR 4,000,000 to PKR 5,000,000. Considering this is simply an estimate, the final cost will depend on the project.
Gray constructions can be considerably influenced by components such as construction site location, housing size, and building materials utilized. Transportation expenses for building supplies and labor might be greater in remote places, increasing the overall cost of the gray project.
Gray constructions generally consist of the foundation, walls, roof, plumbing, electrical wiring, and basic finishing work such as plastering and flooring. The cost of gray constructions does not normally include window, door, and other fixtures and fittings.
10-Marla House Construction Material
The following high-quality building materials are required to construct the A+ grade 10 Marla house:
- Sand
- Bajri
- Rebar
- Kassu
- Cement
- Bricks
Don’t forget to include the cost of plumbing and electrical wiring in this calculation, as the two processes were completed simultaneously.
Furthermore, you cannot buy everything and have the house built for you. A+ category homes demand a team of dependable and trained laborers. Make sure you figure out how much you’ll be paying them.
Why not acquire an estimate for the cost of building a 10 Marla double-story house? This will benefit you when you enter the market since you will know if someone is directing you correctly or not.
Brick, Sand, and Rori Cost:

As you already know the covered area of a 10-marla house, therefore, the number of bricks necessary for the base will be around 90,000. Now, it is critical to choose high-quality bricks because there are many brands available and you may wind up purchasing low-quality bricks.
In the market, you can get bricks for 14 to 15 PKR, so increase it by 90,000 and you’ll have to pay at least 1,260,000 to 1,300,000 PKR.
When it comes to sand, two varieties are commonly used to build houses: Chenab and Ravi. 7,000 cubic feet of Ravi sand are needed, which costs 20 PKR per cubic foot. In contrast, Chenab sand is more expensive since it is of higher grade. However, it is necessary to build a house, like 1,200 cubic ft, and the pricing is 36 PKR cubic ft. As a result, the grand sum of both is 182,000 PKR.
Other materials required, such as gravel or crushed stone, are used in the construction of the house’s floor and roof. To construct a roof, 1,600 cubic feet of Margalla lintel are required, at a cost of around 75 PKR per cubic foot. In contrast, Sargodha gravel is required to construct the floor, and around 1000 cubic feet are required for the gray construction. This material costs around 65 PKR per cubic ft. The entire cost of both materials is 185,000 PKR.
Rori will cost you nearly 35,000 PKR.
Cement, Kassu & Rebar Cost
Kassu is a substance that is used to fill the empty plots for individuals who are unfamiliar with it. Mitti and sand are used to make the substance. Kassu will require around 85 thousand rupees to build an A+ 10 Marla home.
Cement is the primary component in constructing a gray house. If we talk about 5 Marla houses, at least 800 cement bags are required, thus you may quadruple the bags for 10 Marla buildings. Remember that each bag of cement costs 495 PKR in the market. As a result, the grand total is 792,000 PKR.
Sarya is another name for Rebar. A 10 Marla home requires at least 5 tonnes of Sarya, and the market price per kilogramme of Sarya is 105 PKR.
When we add up the amounts of all the materials mentioned above, the final total is 1,402,000 PKR.
Plumbing & Wiring Cost
The plumbing system is an essential component of any home. It is important to ensure that it is of high quality, as otherwise it would need a lot of care and repair, which is not ideal for anybody, especially monetarily.
Along with plumbing, appropriate electrical wiring is an essential component of every home. In 10 Marla homes, at least 135,000 PKR is required for the installation of the plumbing system, which includes drainage, gas lines, and other items.
Furthermore, managing all of the construction process can be very hectic for you. Therefore, you should hire a professional who can oversee all the operations to ensure efficient construction.
In addition, an electrician will execute their work to ensure that the wiring lasts a long time and will charge at least 115,000 PKR.
Other Charges
Additional components that come under the gray structure of the home include steel required to build the chougat, house gate, grills and so on—all of which cost roughly 266,500 PKR.
The water tank installed in the house is included in the cost of the gray structure of 10 Marla residences. It costs around 18,000 PKR and so forth.
Many people choose to obtain a termite spray so that the foundation is not impacted – the full termite infestation process costs roughly 35,000 PKR.
Labor Cost
The cost of labor varies from year to year. Currently, the laborer rate per square foot is 395 PKR. So you’d end up with a grand total of 1,303,500 PKR.
Grey Structure 10 Marla House Grand Total Cost =4,937,000 PKR

Finishing Cost of 10 Marla House
If you believe the grand figure for the gray structure is all for the 10 Marla construction expense, you are incorrect. Even when it comes to finishing the house, there are various areas on which everyone must focus.
Tiles for the Construction of 10 Marla House
Everyone wants to have a home that stands out from other homes. As a result, they adorn it using various ways such as tiles and so on. Master tiles are the most popular in Pakistan because of their superior quality.
Still, for a better understanding, see the breakdown below.
- At least 280 tiles are required to cover the floor of a 10 Marla home. A decent quality fee is at least 2,500 per square foot. Keep in mind that the tiles will cover all parts of the house excluding the bathrooms, garage, and terrace.
- At least 22 tiles are necessary for the patio, and 55 tiles are required for the garage, which will cost you roughly Rs 1,500 each tile.
- The bathroom will require 135 tiles, and the cost will be the same as the patio and garage.
- You will have to pay around 210,000 PKR for laborers.
Marble Expenses
Marble is commonly used to cover staircases, as well as kitchen counters and shelves. So it may all cost you roughly 125,000 PKR.
Switch Boards Cost
A 10 Marla double-story house will require at least 25 switchboards and high-quality switchboard costs roughly 850 PKR. Thus, the total price will be roughly 21,250 PKR.
Light, Lamps, and Power Plugs Stock Price
A minimum of 25 plugs and sockets are required throughout the property, which will cost around 10,025 PKR. The cost of a single item is 475 PKR.
Lights are something that truly brings the place to life. As a result, the installation of lights and lamps throughout the home will cost around 165,000 PKR.
Fans Cost
It is primarily up to the person to decide which brand to put in their house. In the house, 14 fans will be necessary. Good quality fans range in price from 5,000 to 5,500. You can choose one based on your budget. The overall cost would be roughly 77,000 PKR.
When it comes to exhaust fans, you’ll need one for each of the bathrooms and the kitchen. This equates to a total of seven exhaust fans. If you want to put exhaust fans in the rooms as well, the number may rise.
The market pricing for high-quality exhaust fans is roughly 2,500 PKR and the electrician will charge a fee to install the electrical equipment as well, which would be roughly 25,000 PKR.
Bathroom and Kitchen Accessories
The kitchen and bathroom are essential components of every house. So it is crucial to purchase good quality accessories.
If ou just have one kitchen in your two-story house, you will only need one accessory, such as a hood, sink, and so on. If you have two kitchens, twice the numbers and the price.
The market price for two hoods is around 100,000 PKR, while the price for two sinks is 30,000 PKR.
Baths require various items such as a sink, mirror, commode, vanity, and so on. The market price for one commode is 15,000 PKR, thus the total for five is 75,000 PKR. Furthermore, the labor cost will be different.
If you add up the costs of kitchen and bathroom items, including labor, the total would be roughly 390,000 PKR.
Painting and Other Stuff
Painting is also required for adding color and freshness to the home. After the light fittings and fixtures, it is time to paint the walls. Remember that numerous coats of paint are required to get spectacular effects.
You also do not have to pay for all of the necessary accessories, but only the labor cost. As a result, you’ll need a budget of at least 784,500 PKR for painting supplies and labor.
False ceilings are another trend in Pakistan, so expect to pay roughly 188,500 PKR.
Windows and Mirrors
Windows must be installed for a variety of reasons, the most important of which is safety and security. As a result, the procedure will cost you around 335,000 PKR. You may have to spend an additional 65,000 PKR to get a last look at the railing and stairs.
Woodwork Around the House
Woodwork is costly, but it adds beauty and refinement to the home. Semi-solid plywood is commonly used to construct wardrobes and other household items. It total came to about 855,000 PKR.
A+ Category Construction Cost of 10 Marla House Double Story House = 3,916,925 PKR
The total cost of building a 10 Marla home is 4,937,000 PKR (Grey Structure) + 3,916,925 PKR (Finishing Cost) = 8,853,925 PKR.
So, now that you know the ultimate amount, you’re probably wondering how much it will cost to build a 10 Marla single storey house. Simply put, half the costs.
Similarly, if you want to know how much a 10 Marla basement costs, you need first create an estimate. Increase the amount of material and additional supplies as needed later.
Best Construction Company Near Me:
Building a house is a time-consuming procedure. As a result, you need to choose a reputable construction firm to oversee the whole building process and guarantee the project runs well. Nexus Homes is one of Lahore’s prominent building businesses, providing high-quality construction services and consultancy. Contact us today by visiting our website or on-site office to acquire your dream home!
Categories
Latest Post

Are You Finding a Farmhouse in DHA Lahore?


1 Kanal House Construction Cost In Lahore Pakistan